VIPVIP | | RSS
  ¡¡¡¡Association Introduction | Association Event | Industry Information | Member News | Special Report | Technology Exchange
 
Positon: Home » Member News » news »

ZIPPE installs silos at Wiegand-Glas Schleusingen in just one day

  • Released Date£º2020-12-02
  • Valid until£ºStanding
  • View Time£º14
  • Details£º
 

In the middle of November, two furnace pre-silos from ZIPPE, for the new furnace 2 at Wiegand-Glas in Schleusingen, were integrated and installed.

Video Player
 
00:00
 
00:26

 

As the tank building was already closed, the two silos were inserted via the cold end hall and erected directly afterwards.

While setting up the silos, maximum concentration and precision work was indispensable. The installation of the silos could be realized in one day only, thanks to the experienced ZIPPE supervisor Karl Möller, the ZIPPE team and great Wiegand personnel on site.

The new furnace, which is fed with batch from these two silos, is to start production in 2021.

 
[ Member NewsSearch ]  [ ]  [ Tell to friend ]  [ Print ]  [ Close ]  [ ]


Contact
You are not logged in, please sign in to view contact
You can do...if you are member
Info release Promotion
Building shop Online business
Not membership£¬free register now!
 
LatestMember News
 
 
Home | About | Contact | Use Policy | Copyright privacy | Site Map | Links | Message | Advertising
ÎÞ±êÌâÎĵµCopyright 2007-2008 China Architectural and Industrial Glass Association,All Rights Reserved ICP 05037132-4 Technology support£ºBeijing China Glass Modern Technology Glass Co. Ltd. Contact us£ºbjzb@glass.org.cn£»glass@glass.org.cn Tel£º010-57159706 Fax£º010-88372048